- Marine Power Equipment
- Marine Propulsion Equipment
- Marine Deck Equipment
- Marine Mooring Equipment
- Marine Anchoring Equipment
- Marine Outfitting Equipment
- Marine Life Saving Equipment
- Marine Fire Fighting Equipment
- Marine Electrical Equipment
- Communication Navigation Equip
- Marine Auxiliary Machinery
- Marine Pumps and Piping System
- Marine HVAC System
- Marine Special Equipment
- Marine Decorations
- Marine Hardware
- Boat and Yacht
ADD: 18F, No. 157, Zhongshan 3 Rd., Yuzhong district, Chongqing, China
Post code: 400015
Mob/Whatsapp: +86-13640513313
TEL/FAX: +86-23-86595013
Email: manager@bochimachinery.com
Emergency Towing Arrangement(ETA)
Technology & Parameters:
BMETA1000 | BMETA2000 | |
DWT | ≥20,000T-------<50,000T | ≥50,000T |
SWL | 1,000KN | 2,000KN |
ULT. LOAD | 2,000KN | 4,000KN |
NAME | BMETA1000-F with SPM | BMETA2000-F with SPM |
CHAFING CHAIN | U3 φ76 L=8.39 m | U3 φ76 L=8.39 m |
CHIAN STOPPER | casting steel :scw410 | casting steel :scw410 |
FAIRLEAD/STRONG POINT | 600X450 mm scw410 | 600X450 mm scw410 |
PEDESTAL ROLLER | φ350 mm | φ350 mm |
STORAGE BOX | Storing chafing chain | Storing chafing chain |
NAME | BMETA1000-A | BMETA2000-A |
TOWING PENNANT | φ65 6X37 IWR Wire rope galvanized |
φ80 8X37 IWR Wire rope galvanized |
STRONG POINT | casting steel 400X260mm scw410 |
casting steel 600X350 mm scw410 |
STORAGE DRUM | Storing towing pennant | Storing towing pennant |
PICK UP GEAR | assist to pick up towing pennant | assist to pick up towing pennant |
STORAGE BOX | Storing pick up gear | Storing pick up gear |
The Characteristics Of Bmeta Type Eta
1. All components are designed with computer aided system, complying with the criterion of IMO and type approved by LR, DNV, NK, ABS, BV, RINA, GL.
2. Reasonable formed complete set and applicable for new and existing tankers.
3. Strongpoint and fairlead are integral for afterward part of tankers.
4. Forward part of ETA can be served as SPM (Single Point Mooring), complying with the criterion of OCIMF and classification societies.
5. The damping appliance is designed for storage drum to limit the speed of towing pennant, the force reducer is designed for winding pennant easily.
6. Pick up gear box deployed quickly for towing messenger rope throw to the sea.
7. The arrangement design, equipment installation and structure reinforcement solution for ETA are served .
8. According to the requirement of clients, different components and configurations are served.